|
|
| Design and Build Sub-Contract Conditions (DBSub/C) |
|
|
|
| Appropriate: for use with the design and build contract: for sub-contract works whether or not they include design by the sub-contractor. Can be used: where the sub-contract works and/or main contract works are to be carried out in sections; For sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc) or by complete re-measurement of the sub-contract works. |
|
 |
| Below is a selection of our bestselling similar items |
|
 |
 |
|
 |
|
|
| Your basket is currently empty |
|
 |
| Enter your email address to join
our mailing list |
|
 |  |
 |
|
|