|
|
| Standard Building Sub-Contract Agreement (SBCSub/A) |
|
|
|
| Appropriate: for use where the main contract is the Standard Building Contract (with quantities, without quantities or with approx quantities): for sub-contract works where the Sub-Contractor is not required to Design. Can be used: where the sub-contract works and/or main contract works are to be carries out in sections; for sub-contract works that are to be carried out on the basis of an adjusted sub-contract sum (adjustment for variations etc:) or by complete re-measurement. Not Suitable: where the sub-contractor is to design any part of the sub-contract works, even though the other criteria are met -consider the Standard Building Sub-Contract with sub- contractors design (SBCSub/D/A and SBCSubD/C). |
|
 |
| Below is a selection of our bestselling similar items |
|
 |
 |
|
 |
|
|
| Your basket is currently empty |
|
 |
| Enter your email address to join
our mailing list |
|
 |  |
 |
|
|